This alert represents a BIG change in an order's lines. If the style, color or unit is changed on a line, the only option for the changes to be made in the scheduled job is to manually make those changes.
These changes need to be checked and double checked. Manually making these changes will allow the user to question the style, color or unit changes if needed.
Comments
Article is closed for comments.