System Options
| Calculate Installation Depot Maximum Capacity Based On | Manually Entered Depot Capacities |
| View Installation Depot Capacities By | Number of Crews Available |
| Deduct Crews from Installation Depot Capacities Based On | Automatically Deduct Calculate Based on Line Quantities |
Overview
Capacity for Specific Date for Installation Depot =
Installation Total Depot Capacity - Crew Assigned Deduction - No Crew Assigned Deduction - No Crew Assigned Crossover Deduction
Depot Capacities are NOT based on Daily Qty Limit or Jobs Per Day entered for individual Crews.
Amount Deducted from Depot Capacities IS based on Daily Qty Limit entered for individual Crews.
Amount Deducted from Depot Capacities is NOT based on Crew Time Off data.
Crossover Deduction Analysis will be NOT done.
Only lines with a Deduct Capacity green checkmark and scheduled units > 0 will be considered.
Installation Depot Total Capacity
ALL - Manually Entered Total Number of Crews for DOW
Job Type - Manually Entered Total Number of Crews for Job Type for DOW
Crew Assigned Deduction
ALL - For each Job Type the following will be calculated and subtracted from the All Tab
- For Jobs where Scheduled Install Date = Calendar Date and Job Depot = Current Depot and Crew = Assigned
- Sum(Line Qty / Crew's Daily Qty Limit for Line Job Type)
Job Type - The following will be calculated and subtracted from the Job Type Tab Available Capacity
- For Jobs where Job Type = Job Type Tab and Scheduled Install Date = Calendar Date and Job Depot = Current Depot and Crew = Assigned
- Sum(Line Qty / Crew's Daily Qty Limit for Line Job Type)
No Crew Assigned Deduction
ALL - For each Job Type the following will be calculated and subtracted from the All Tab
- For Jobs where Scheduled Install Date = Calendar Date and Job Depot = Current Depot and Crew = Not Assigned
- Sum(Line Qty / Average Crew Daily Qty Limit for Line Job Type)
Job Type - The following will be calculated and subtracted from the Job Type Tab Available Capacity
- For Jobs where Job Type = Job Type Tab and Scheduled Install Date = Calendar Date and Job Depot = Current Depot and Crew = Not Assigned
- Sum(Line Qty / Average Crew Daily Qty Limit for Line Job Type)
No Crew Assigned Crossover Deduction
NA for these system options
Other Formulas
Average Crew Daily Qty Limit = Total Daily Qty Limit for Crews installing Job Type) / Number of Crews installing Job Type