Sales Report>File> Finance>WIP
This report summarizes revenues and costs incurred to date with projected revenues and costs to complete the project for billing groups.
|
Purpose |
Billing Group Progress |
Data Source |
Billing Group Order Lines |
|||
|
By Store |
Y |
By Sales Rep |
N |
By Product Code |
Y |
|
|
Profit |
Projected |
Customer Type |
N |
Balance Due |
N |
|
|
Order Status |
Written and Delivered |
.CSV output |
Y |
User Defined |
N |
|
|
Paper Size |
8.5 X11 |
Balance to |
|
|||
|
Common uses:
|
||||||
|
Tips for Use: Since this report pulls from line information, it does not include tax or miscellaneous cost in profit numbers. Load, freight, and overhead are also not included. |
||||||

The wording on the Work in Progress Report options screen was changed from Ending Date to Date to more accurately reflect that the date for this report determines how to group things on the report.
Listed below are the column headings of this report and where the numbers originate.

|
Product |
Product Code |
|
Contract Amount |
Total Amount of all orders in the billing group |
|
Change Orders |
Amount of change orders. NOTE: This amount pulls from the lines on the change order. The invoice has to be marked as a changed order in the billing group in order for this report to recognize the invoice as a change order and place the change order number on the report in this column. |
|
Adjusted Total |
Total of all invoices less any change orders. |
|
Del. To Date |
Total of all lines by product code that are in a job costed status. |
|
Profit To Date |
This number is calculated by taking the Delivered Net Sale amount and subtracting the following cost: Delivered Material Cost Delivered Service Cost Delivered Overhead Margin Cost Delivered Freight Cost Delivered Tax Cost |
|
GP% |
GP% is calculated on the delivered (job costed) portion of the sale. To calculate the GP%: Profit to date \ Del. To Date = GP% |
|
% Del. |
% Delivered is how much of the job that has been billed so far. Delivered to Date / Contract Amount = % Delivered |
|
Current Shipped |
For Non-ERRM users, current shipped not job costed are lines on the Not Jobcosted order that a picking ticket has been run for. Therefore the lines are in a delivered status. |
|
|
For ERRM users current shipped not job costed are lines on the order that a delivery ticket has been run for. Therefore the lines are in a delivered status. |
|
Current Not Shipped |
Current not shipped is the value of all lines in the billing group by product code that is not in a delivered or job costed status |
|
Projected Cost Undelivered |
Cost of all lines by product code in the billing group which are not in a delivered or job costed status. |
|
Projected Profit Undelivered |
Projected profit on all lines in the billing group by Product code that is not in a delivered or job costed status. To calculate the % undelivered profit: Contract Amount – Projected Cost = Projected Profit Undelivered |
Comments
Article is closed for comments.